Near RT-RIC Architecture Task Group
Must have:
•WG3 use case and requirements specification
•E2 interface specifications
•Near-RT RIC Architecture specification
•Near-RIC API interface specifications
•WG3-related test and conformance specifications
•Near-RT RIC management specifications
•Define the use cases and requirements related to Near-RT RIC and E2 interface
•Define E2 interface between Near-RT RIC and E2 Nodes to enable near-real-time control and optimization of RAN elements and resources via fine-grained data collection and actions
•Define Near-RT RIC internal architecture
•Define the Near-RT RIC APIs between Near-RT RIC platform and xApps
•Define the WG3-related test and conformance specifications
•Coordinate with WG2 regarding A1 control loops.
•Coordinate with WG10/WG6 on xApp LCM and general Near-RT RIC O1
•Coordinate with SFG on WG3 security issues
Reliance Jio (JIO): Vikas Dixit
China Mobile (CMCC): Xiaofei XU
NOKIA (NOK): Paul Stephens
SAMSUNG (SAM): Jun Song